DATE OF ADVERTISEMENT: August 20, 2008 in Herald Newspapers
ADVERTISEMENT FOR BIDS
BOARD OF CHOSEN FREEHOLDERS
CAPE MAY COUNTY – NEW JERSEY
NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ADDRESSED TO STEPHEN O’CONNOR, COUNTY ADMINISTRATOR OF THE BOARD, WILL BE RECEIVED UP TO 2:00 P.M. PREVAILING TIME, ON Wednesday September 3, 2008, AT WHICH TIME THEY WILL BE PUBLICLY OPENED AND READ IN THE INTERMEDIATE MEETING ROOM (E142), WILLIAM E. STURM, JR. ADMINISTRATION BUILDING, 4 MOORE ROAD, CREST HAVEN COMPLEX, CAPE MAY COURT HOUSE, NEW JERSEY, FOR THE FOLLOWING:
“CAPE MAY COUNTY PUBLIC SAFETY TRAINING CENTER
2008 PISTOL RANGE BERM IMPROVEMENTS
TOWNSHIP OF MIDDLE”
PROPOSAL FORMS, SPECIFICATIONS AND OTHER BIDDING DOCUMENTS MAY BE OBTAINED UPON PAYMENT OF A $30.00 CHARGE (NON- REFUNDABLE), AT THE OFFICE OF THE COUNTY ENGINEER, DALE M. FOSTER, (609) 465-1035, DURING NORMAL OFFICE HOURS AT THE ABOVE ADDRESS.
THE BOARD RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS IN WHOLE OR IN PART AND TO WAIVE SUCH INFORMALITIES AS MAY BE PERMITTED BY LAW.
BIDDERS ARE REQUIRED TO COMPLY WITH THE REQUIREMENTS OF P.L. 1975, C. 127 (N.J.A.C.17: 27) AND CHAPTER 33 OF THE PUBLIC LAWS OF 1977.
BIDS MUST BE MADE ON STANDARD PROPOSAL FORM IN THE MANNER DESIGNATED THEREIN AND REQUIRED BY THE SPECIFICATIONS, MUST BE ENCLOSED IN SEALED ENVELOPES BEARING THE NAME AND ADDRESS OF THE BIDDER AND MARKED “CAPE MAY COUNTY PUBLIC SAFETY TRAINING CENTER 2008 PISTOL RANGE BERM IMPROVEMENTS TOWNSHIP OF MIDDLE”ON THE OUTSIDE, ADDRESSED TO STEPHEN O’CONNOR, COUNTY ADMINISTRATOR OF THE BOARD, ADMINISTRATION BUILDING, 4 MOORE ROAD, CREST HAVEN COMPLEX, CAPE MAY COURT HOUSE, NEW JERSEY 08210, AND MUST BE ACCOMPANIED BY A CASHIER’S OR CERTIFIED CHECK OR A BID BOND FOR NOT LESS THAN 10% (TEN) PERCENT OF THE AMOUNT BID, BUT NOT IN EXCESS OF $20,000.00, DRAWN TO THE ORDER OF CAPE MAY COUNTY TREASURER, AND BE DELIVERED AT THE PLACE ON OR BEFORE THE HOUR NAMED ABOVE.
STEPHEN O’CONNOR DANIEL BEYEL
County Administrator Director
ADDENDUM NO. 1
Addendum No. 1 has been issued to the Contract Documents for the referenced project. The revision listed shall be made to the Contract Documents issued for the receipt of bids. This addendum shall become part of the total contract.
The Bidder shall acknowledge receipt of this Addendum by signing and returning the attached acknowledgement sheet with the Bidder’s Proposal.
The County regrets any inconvenience that this Addendum causes.
The revisions listed below shall become part of the contract, due consideration to these revisions shall be made by the Contractor in preparing his bid for the project. The Contractor shall acknowledge receipt of this Addendum by signing and returning the attached sheet with the Contractor’s Proposal. Proposals not including a signed copy of the attached sheet will not be considered.
THE FOLLOWING CHANGES SHALL BE MADE TO THE PLANS:
On Sheet 1 of 1, the following changes are to be made:
In the To Be Constructed box, the following Item No. shall be revised to read as noted below
Item Where Contract Plan
No. Description Unit Quantity Quan. Directed
3 Borrow Excavation, Selected Material CY 552 502 50
Acknowledgement is hereby made of Addendum No. 1, issued on August 25, 2008, received since the issuance of the Contract Documents for 2008 PISTOL RANGE BERM IMPROVEMENTS, TOWNSHIP OF MIDDLE, CAPE MAY COUNTY, NJ. The Contractor shall include this signed sheet with his bid package.
Signature of Bidder: _______________________________________
Title: _______________________________________
Name of Firm: _______________________________________
Address: _______________________________________
_______________________________________
Date: ________________________________________
ADDENDUM NO. 2
Addendum No. 2 has been issued to the Contract Documents for the referenced project. The revision listed shall be made to the Contract Documents issued for the receipt of bids. This addendum shall become part of the total contract.
Please note that Addendum No. 1 changes the receipt of bids from2:00 P.M., Wednesday, September 3, 2008,to 2:00 P.M., Tuesday, September 16, 2008.
The Bidder shall acknowledge receipt of this Addendum by signing and returning the attached acknowledgement sheet with the Bidder’s Proposal.
The County regrets any inconvenience that this Addendum causes.
The revisions listed below shall become part of the contract, due consideration to these revisions shall be made by the Contractor in preparing his bid for the project. The Contractor shall acknowledge receipt of this Addendum by signing and returning the attached sheet with the Contractor’s Proposal. Proposals not including a signed copy of the attached sheet will not be considered.
THE FOLLOWING CHANGES SHALL BE MADE TO THE ADVERTISEMENT FOR PROPOSALS:
The first paragraph of the Advertisement for Proposals is revised to read as follows:
NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ADDRESSED TO STEPHEN O’CONNOR, COUNTY ADMINISTRATOR OF THE BOARD, WILL BE RECEIVED UP TO 2:00 P.M. PREVAILING TIME, ON Tuesday September 16, 2008, AT WHICH TIME THEY WILL BE PUBLICLY OPENED AND READ IN THE WILLIAM E. STURM, JR. ADMINISTRATION BUILDING, 4 MOORE ROAD, CREST HAVEN COMPLEX, CAPE MAY COURT HOUSE, NEW JERSEY, FOR THE FOLLOWING:
“CAPE MAY COUNTY PUBLIC SAFETY TRAINING CENTER
2008 PISTOL RANGE BERM IMPROVEMENTS
TOWNSHIP OF MIDDLE”
STEPHEN O’CONNOR, DANIEL BEYEL,
CLERK/ADMINSTRATOR FREEHOLDER DIRECTOR
Acknowledgement is hereby made of Addendum No. 2, issued on September 2, 2008, received since the issuance of the Contract Documents for 2008 PISTOL RANGE BERM IMPROVEMENTS, TOWNSHIP OF MIDDLE, CAPE MAY COUNTY, NJ. The Contractor shall include this signed sheet with his bid package.
Signature of Bidder: _______________________________________
Title: _______________________________________
Name of Firm: _______________________________________
Address: _______________________________________
_______________________________________
Date: _______________________________________
ADDENDUM NO 3
Addendum No. 3 has been issued to the Contract Documents for the referenced project. The revision listed shall be made to the Contract Documents issued for the receipt of bids. This addendum shall become part of the total contract.
Please note that Addendum No. 3 changes the receipt of bids from2:00 P.M., Tuesday, September 16, 2008,to 2:00 P.M., Thursday, September 18, 2008.
The Bidder shall acknowledge receipt of this Addendum by signing and returning the attached acknowledgement sheet with the Bidder’s Proposal.
The County regrets any inconvenience that this Addendum causes.
The revisions listed below shall become part of the contract, due consideration to these revisions shall be made by the Contractor in preparing his bid for the project. The Contractor shall acknowledge receipt of this Addendum by signing and returning the attached sheet with the Contractor’s Proposal. Proposals not including a signed copy of the attached sheet will not be considered.
THE FOLLOWING CHANGES SHALL BE MADE TO THE ADVERTISEMENT FOR PROPOSALS:
The first paragraph of the Advertisement for Proposals is revised to read as follows:
NOTICE IS HEREBY GIVEN THAT SEALED PROPOSALS ADDRESSED TO STEPHEN O’CONNOR, COUNTY ADMINISTRATOR OF THE BOARD, WILL BE RECEIVED UP TO 2:00 P.M. PREVAILING TIME, ON Thursday September 18, 2008, AT WHICH TIME THEY WILL BE PUBLICLY OPENED AND READ IN THE WILLIAM E. STURM, JR. ADMINISTRATION BUILDING, 4 MOORE ROAD, CREST HAVEN COMPLEX, CAPE MAY COURT HOUSE, NEW JERSEY, FOR THE FOLLOWING:
“CAPE MAY COUNTY PUBLIC SAFETY TRAINING CENTER
2008 PISTOL RANGE BERM IMPROVEMENTS
TOWNSHIP OF MIDDLE”
THE FOLLOWING CHANGES SHALL BE MADE TO THE ADVERTISEMENT FOR PROPOSALS:
Page P1of 2 of the Proposal, the following Item Nos. shall be revised to read as noted below:
Item Unit Contract Unit
No. Description Quantity Price Amount
“2 Roadway Excavation, Unclassified CY 552
3 Borrow Excavation, Selected Materials CY 175
6 Waste Disposal CY 175 “
New proposal page, Pages P-1R of 2, dated September 9, 2008 is attached and shall be substituted for the original page as found in the Contract Documents.
THE FOLLOWING CHANGES SHALL BE MADE TO THE PLANS:
On Sheet 1 of 1, the following changes are to be made to the To Be Constructed Table: If and
Item Contract Plan Where
No. Description Units Quantity Quantity Directed
“2 Roadway Excavation, Unclassified 50 CY 552 502
3 Borrow Excavation, Selected Materials 20 CY 175 155
6 Waste Disposal 20” CY 175 155
THE FOLLOWING CHANGES SHALL BE MADE TO THE SPECIFICATIONS:
Subsection 202.01 Description., Page 38: Add the following:
This work shall also include the sifting of the materials excavated from the front slope of the existing pistol range berm.”
“The Contractor shall excavate the front face of the pistol range berm to the limits as noted in the plans and as directed. The excavated material shall be sifted and the material that passes through the #4 sieve and contains less than 40% clay-size particles passing the #200 sieve shall be returned for re-use in the reconstruction of the front face of the pistol range berm. Any material not passing the #4 sieve shall be treated as hazardous waste and shall be disposed of in accordance with other parts of the Special Provisions. Any deficit in material for the front face of the berm shall be made up by using Borrow Excavation, Selected Materials.”
Subsection 202.13 Disposal of Regulated Waste., 1. Removal of Soil, Page 38:Revised the Special Provisions of this Subsection to read as follows:
“1. Removal of Soil – The berm soil shall be removed to the limits indicated on the Contract Drawings. The soil shall be sifted and the material that passes through the #4 sieve and contains less than 40% clay-size particles passing the #200 sieve shall be returned for re-use in the reconstruction of the front face of the pistol range berm. Any material not passing the #4 sieve shall be treated as hazardous waste and shall be properly disposed of.”
Subsection 202.14 Method of Measurement., Page 38:Add the following:
“Waste disposal will be measured by the cubic yard of material that is unsuitable to return fro re-use in the reconstruction of the front slope of the berm.
Roadway Excavation, Unclassified shall include all costs associated with the excavation of the front slope of the pistol range berm; the screening of the excavated materials; and the re-use and placement of the suitable screened materials into the reconstructed front slope of the pistol range berm.”
Subsection 202.15 Basis of Payment., Page 39:Add the following:
“Payment will be made under:
Pay Item Pay Unit
Waste DISPOSAL CUBIC YARD
ROADWAY EXCAVATION, UNCLASSIFIED CUBIC YARD”
Acknowledgement is hereby made of Addendum No. 3, issued on September 9, 2008, received since the issuance of the Contract Documents for 2008 PISTOL RANGE BERM IMPROVEMENTS, TOWNSHIP OF MIDDLE, CAPE MAY COUNTY, NJ. The Contractor shall include this signed sheet with his bid package.
Signature of Bidder: _______________________________________
Title: _______________________________________
Name of Firm: _______________________________________
Address: _______________________________________
_______________________________________
Date: ________________________________________